Brief / Description: We were appointed by Burnley-based Culeth Construction (Motorpoint) to satisfy a number of planning conditions and to produce the SBEM Calculations for the proposed Motor Point sales building and workshop building in Castleford.
Highlights:
“We appointed Aldrock to assist in satisfying energy-related conditions within planning and building Regulations. From the outset, Aldrock took control of the situation and liaised directly with the appropriate people to ensure everything was satisfactory. As with many projects, materials and building services were altered along the way and having Aldrock working closely by our side, this was a very smooth process.
The early appointment with Aldrock to Satisfy Part L with SBEM Calculations ensured there were no surprises later in the project. I would happily recommend Aldrock to everyone, as our experience was excellent, delivering an efficient cost-efficient solution.”
– Howard Thompson, Culeth Construction